Inspection Services
Pricing Guide

Structural Inspection & Certification — MD · VA · CT

Every element on your invoice traces to one of four pricing mechanisms: administrative fees, product rates with production days, flat rates, or system bundles. This guide shows each, with worked examples, so you can estimate your project total before we begin.

All prices subject to adjustment based on project complexity and specific requirements. Rates reflect professional liability exposure audited annually by our insurance provider.

Administrative

Fees & Surcharges

Fee Trigger Rate
Production Day Each on-site inspection day $600/day
Rush Service < 24 hours notice $400
No Show No one present, no prior notice $400
Post-Production Inspection Reviewing completed work 2 × (services + prod. days)

Post-production inspections carry double the standard rate — certifying work after completion means conditions can no longer be directly observed during installation, increasing liability.


Pricing by Product — Special Inspections

Continuous Oversight with Production Days

These products require on-site presence during installation. The base rate covers certification; production days reflect actual time on site. IBC code requirements for Continuous Special Inspections determine which products fall into this category.

Anchor Systems

Service Base + Production Required Add-ons
Wall Anchors $400 days × $600 Backfill required $300
Wall Anchors + C-Channels $400 days × $600 Backfill required $300

Slab Patch/Repair in garages (reverse installations): additional $300

Vertical Support Systems

Service Base + Production
Carbon Fiber Strips (CFRP) $400 days × $600
Intellibraces (PowerBrace) $400 days × $600

Underpinning — Deep Driven Foundations

Service Base + Production Required Add-ons
Push Piers $400 days × $600 Backfill required $300
Helical Piers $400 days × $600 Backfill required $300
Slab Piers $400 days × $600 Slab Patch required $300

Backfill inspections verify soil replacement and compaction around structural elements. Slab patch/repair ensures safe restoration of concrete surfaces after invasive work. Both are mandated for compliance.


Pricing by Task

Fixed-Scope Inspections

When the scope is fully defined, a single rate replaces the base + production day formula. Predictable cost, streamlined scheduling.

Service Rate Includes
ABCD Foundations $600 Backfill inspection per section

Pricing by Product — Flat Rate

Standardized Scope Items

No production day multiplier. Can be combined with production day services when projects span multiple categories.

Horizontal Support Systems

Service Rate
Steel Supplemental Beam (S-type or W-type) $400
Lumber Main Beams $300
Lumber Perimeter Beams $300
Lumber Sill Plates $300
Lumber Band Boards $300
Lumber Rim Joists $300
Lumber Web Stiffeners — TJs $300
Lumber Floor Joists $300
Lumber Subfloors $300

Vertical Support Systems

Service Rate
Intellijacks + CIP Footers $400
Intellijacks + Precast Footers $400
Wall Pins $400

Pricing by System

Bundled System Inspections

Encapsulation

System Rate Components Inspected
Encapsulation System $300 CrawlSeal (20mil barrier), ExtremeBloc insulation, dehumidifier

Encapsulation inspections verify completeness and quality of moisture and air control layers in crawlspaces — barrier integrity, insulation alignment, and humidity management.

Water Management

System Rate
Water Management (basement or crawlspace) $300

Basement Water Management — Components

Required with Basement Gutter and/or Drain Tile: WallSeal 6mil Moisture Barrier ($300) and Slab Patch/Repair ($300). Ensures moisture control at wall-floor interfaces and durable concrete restoration.

Crawlspace Water Management — Components


Worked Examples

From Line Items to Totals

Five scenarios showing how base rates, production days, and required add-ons compose into a final invoice.

1 — Wall Anchors, 2 Production Days
Base rate$400
Production — 2 × $600$1,200
Backfill req$300
Total$1,900
2 — Carbon Fiber Strips, 1 Day
Base rate$400
Production — 1 × $600$600
Total$1,000
3 — Lumber Main Beams (Flat)
Total$300
4 — Basement WM + Drain Tile
Base system rate$300
WallSeal 6mil req$300
Slab Patch req$300
Total$900
5 — Post-Production Inspection
Services cost (assumed)$2,000
Production days — 3 × $600$1,800
Subtotal (services + production)$3,800
Post-production fee — 2 × subtotal 
Post-Production Total$7,600

Reference

Important Notes & Policies

Pricing Philosophy
Rates reflect risk and liability per product category, audited annually by our professional liability insurer.
Production Days
$600/day for continuous on-site oversight. IBC Special Inspection requirements determine which products need this.
Required Services
Backfills, Slab Patch/Repair, and WallSeal are mandated for compliance — marked required in the tables above.
Emergency / Rush
Less than 24 hours notice adds a $400 rush fee.
Missed Appointments
No one present at the permitted address without prior notice: $400 no-show fee.
Post-Production
2× total cost (services + production days) to reflect the added liability of certifying completed work.

Aligning logistics early and confirming access details helps avoid avoidable fees and keeps your project on track.